My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-23-09 Drainage and Flooding Committee meeting minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
03-23-09 Drainage and Flooding Committee meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:46:48 AM
Creation date
3/21/2025 2:28:01 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
3/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reinforced box (RCB) with headwall and wing walls. The limits of the trunk line <br />replacement are from the outfall to North Sycamore. <br />This configuration has a design capacity of 218 cfs for a 5-year event at the outfall and <br />keeps the HGL below Fleetwood Drive throughout the limits of pipe replacement. This <br />is accomplished by the additional cover over the trunk in the border areas and can easily <br />be accomplished in Alternative 1. <br />The associated construction estimate is approximately $1.23 million including 10% for <br />contingencies. Include 12% for engineering and surveying for $1.37 million. Increases <br />in cost over Alternative 1 are due to replacing the entire storm sewer with new pipe over <br />leaving the pipe in use. <br />3.3 Alternative 3 <br />Alternative 3 is the addition of a parallel storm sewer trunk line under the northbound <br />travel lane of Fleetwood Drive between Mesquite and North Spruce. This option is <br />similar to Alternative 1 with only about 2,200 LF of pipe placed under northbound <br />Fleetwood Drive. To keep the HGL below the pavement in this alternative, larger pipe <br />sizes have to be used closer to the outfall. <br />This configuration has a design capacity of 218 cfs for a 5-year event at the outfall and <br />keeps the HGL below Fleetwood Drive. <br />The associated construction estimate is approximately $1.00 million including 10% for <br />contingencies. Include 12% for engineering and surveying for $1.12 million. The costs <br />are similar the Alternative 1 because larger size pipe is used downstream for a greater <br />length to increase capacity and keep the HGL below grade. This increases in the larger <br />pipe quantities more than offsets savings in pavement repair. <br />_ 3-2 <br />Klotz Associates Project No. 0127.009.000 Fairmont Park East & Brookglen Drainage Study <br />May 2009 City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.