Laserfiche WebLink
TABLES <br />Table 1 <br />Alternative 1 Cost Estimate <br />Table 2 <br />Alternative 2 Cost Estimate <br />Table 3 <br />Alternative 3 Cost Estimate <br />EXHIBITS <br />Exhibit 1 <br />Vicinity Map <br />Exhibit 2 <br />Fairmont Park East Drainage Area & Storm Sewer Map <br />Exhibit 3 <br />Fairmont Park East 6-inch Ponding Depth Above Top of Curb <br />Exhibit 4 <br />Fairmont Park East 12-inch Ponding Depth Above Top of Curb <br />Exhibit 5 <br />Fairmont Park East 18-inch Ponding Depth Above Top of Curb <br />Exhibit 5 <br />Confluence of B 112-00-00 and B 112-02-00 <br />APPENDICES <br />Appendix A Existing Capacity Storm Calculations & HGL Profiles <br />Appendix B Proposed Alternatives Calculations & HGL Profiles <br />Appendix C Hydrologic Data <br />TOC-2 <br />Klotz Associates Project No. 0127.009.000 Fairmont Park East Bayou Drainage Study <br />May 2009 City of La Porte <br />