Laserfiche WebLink
<br />FIGURES <br /> <br />Figure 1 <br /> <br />Photograph of B 112-00-00 Confluence with B 112-02-00 Northeast <br />Quadrant Looking Downstream <br /> <br />Photograph of B 112-00-00 Looking Downstream <br /> <br />Figure 2 <br /> <br />TABLES <br /> <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br /> <br />Summary of Storm Frequency Peak Flows for Fairmont Park East <br />Alternative 1 Cost Estimate <br /> <br />Alternative 2A Cost Estimate <br /> <br />Alternative 2B Cost Estimate <br /> <br />Alternative 3 Cost Estimate <br /> <br />Table 6 <br /> <br />Alternative 4 Cost Estimate <br /> <br />Table 7 <br /> <br />Cost Estimate - Mitigate in B 1 06-02-00 to Attenuate Increased Peak <br />Flows for All Alternatives <br /> <br />GRAPHS <br /> <br />Graph 1 <br /> <br />Existing and Proposed Fleetwood Drive Profile Grade Line with Side <br />Street Low Point Elevations <br /> <br />TOC-2 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />