My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-03-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
06-03-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:11 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
6/3/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FIGURES <br /> <br />Figure 1 <br /> <br />Photograph of B 112-00-00 Confluence with B 112-02-00 Northeast <br />Quadrant Looking Downstream <br /> <br />Photograph of B 112-00-00 Looking Downstream <br /> <br />Figure 2 <br /> <br />TABLES <br /> <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br /> <br />Summary of Storm Frequency Peak Flows for Fairmont Park East <br />Alternative 1 Cost Estimate <br /> <br />Alternative 2A Cost Estimate <br /> <br />Alternative 2B Cost Estimate <br /> <br />Alternative 3 Cost Estimate <br /> <br />Table 6 <br /> <br />Alternative 4 Cost Estimate <br /> <br />Table 7 <br /> <br />Cost Estimate - Mitigate in B 1 06-02-00 to Attenuate Increased Peak <br />Flows for All Alternatives <br /> <br />GRAPHS <br /> <br />Graph 1 <br /> <br />Existing and Proposed Fleetwood Drive Profile Grade Line with Side <br />Street Low Point Elevations <br /> <br />TOC-2 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />May 2009 <br /> <br />Fairmont Park East & Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.