Laserfiche WebLink
<br />Table 7 <br />Alternative-5 <br /> <br />Removal and Replace Roadway with Lower Profile Grade Line for Fleetwood Drive <br />From S. Spruce to Mulberry Drive & Storm Sewer Replacement from S. Spruce <br />and HCFCD 8106-02-00 <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 62,000.00 $ 62,000.00 <br />2 Remove & Dispose of Existing Pavement SY 4,540 $ 3.10 $ 14,080.00 <br />Full Width, Intersections & Crossing Streets <br />3 Remove & Dispose of Existing Storm Pipe LF 2,155 $ 16.00 $ 34,480.00 <br />4 Roadway Excavation CY 1,286 $ 4.60 $ 5,920.00 <br />5 Storm Excavation CY 1,347 $ 6.00 $ 8,090.00 <br />6 7" Reinforced Concrete Pavement SY 4,540 $ 40.00 $ 181,600.00 <br />(Include Subgrade) <br />7 Curb Ramps EA 20 $ 3,300.00 $ 66,000.00 <br />8 Inlets Types A, B, C EA 30 $ 2,700 $ 81,000.00 <br />9 24" Reinforced Concrete Pipe for Additional Curb LF 770 $ 50 $ 38,500.00 <br />Return Inlets <br /> 54" Reinforced Concrete Pipe LF 305 $ 140.00 $ 42,700.00 <br /> 60" Reinforced Concrete Pipe LF 238 $ 165.00 $ 39,270.00 <br /> 6' x 5' Reinforced Concrete Box LF 588 $ 200.00 $ 117,600.00 <br /> 8' x 5' Reinforced Concrete Box LF 570 $ 270.00 $ 153,900.00 <br /> 8' x 6' Reinforced Concrete Box LF 1,015 $ 350.00 $ 355,250.00 <br />10 Manholes EA 6 $ 3,000.00 $ 19,300.00 <br />11 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />12 5" Concrete Riprap SY 75 $ 42.00 $ 1,575.00 <br />13 Cement Stabilized Sand Ton 1,344 $ 60.00 $ 80,660.00 <br />14 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Roadway - Subtotal Construction: $ 1,346,925.00 <br />10% Contingency $ 134,692.50 <br />Trunk Line & Roadwav - Total Construction: $ 1,481,617.50 <br />Total Construction & Enqineerinq (12%): $ 1,659,411.60 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />August 2009 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />