Laserfiche WebLink
City of La Porte <br /> Drainage Projects <br /> Engineering Consultant Recommendations <br /> Project Description and Recommendation <br /> Battleground Estates Channel Improvements along South Boundary of Battleground <br /> Estates and potential Mitigation Pond to mitigate flows estimated <br /> at $849,000. <br /> Recommend requesting proposal for Preliminary Engineering <br /> Report from Klotz Associates and Proposal for Design Services <br /> from UA Engineering, Inc. <br /> Shady River Channel Improvements along A104- 00 -00, Taylor Bayou <br /> Watershed, and potential Mitigation Pond to mitigate flows <br /> estimated at $361,000. <br /> Recommend requesting proposal for Design Services from Civil <br /> Tech Engineering, Inc. <br /> PER for F101 -06 -00 Excavation of approximately 200 Acre -Feet of unutilized portions <br /> of Northwest Park to relieve headwater flow from B106- 00 -00, Big <br /> Island Slough or re- direct flow for a portion of F101 -06 -00 from <br /> East to West utilizing detention prior to release in B106 -00 -00 <br /> estimated at $4.5 million. <br /> Recommend requesting proposal for Preliminary Engineering <br /> Report from Klotz, Associates, Inc. <br /> PER for B112-00-00 Approximately 3000 feet of Channel Lining and Potential <br /> Mitigation Pond along B112 -00 -00 between Spencer Highway and <br /> Fairmont Parkway. <br /> Recommend requesting proposal for Preliminary Engineering <br /> report from Civil Tech Engineering, Inc. <br />