My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-02-11 Drainage and Flooding Committee Meeting minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2011
>
05-02-11 Drainage and Flooding Committee Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:27 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z ` <br /> klotz(�llassociates <br /> Mr. Julian Garza Jr., P.E. <br /> July 5, 2011 <br /> Page 6 of 7 <br /> investigation costs. We have obtained proposal from LJA Engineering to conduct the field <br /> surveying estimated at $15,500. We have obtained proposal from Terracon to conduct the <br /> soils investigation estimated at $5,490. We have obtained a proposal from Berg Oliver to <br /> prepare the environmental investigation estimated at $5,200. The proposals from each of the <br /> sub - contractors are attached to this scope of work. Two of the proposals from the sub - <br /> consultants include different options and we have included in this proposal the lowest of each <br /> of the sub proposals. If it is determined to select other options from the sub consultants then <br /> this scope of work and budget will need to be changed to reflect the selected services. It is <br /> anticipated that each of the sub - contractors will contract directly with Klotz Associates. <br /> The estimated budget includes ten printed (10) copies of the final report. If more copies are <br /> required, additional budget will be requested. The estimated budget amount includes sub <br /> consultant costs associated with the landscape consultant. <br /> Items not included in the scope of work fee are: <br /> The estimated amount does not include following costs: <br /> 1. Preliminary 30% construction plans. <br /> 2. Detailed engineering. <br /> 3. Permit application preparation, negotiation, or submittal. <br /> 4. Submittals to FEMA. <br /> 5. Separate meeting or reports to present the recommendations to Harris County or to <br /> HCFCD. <br /> SCHEDULE <br /> The estimated time for completion of the tasks in the above scopes is approximately six <br /> months after receipt of the executed copy of this Agreement and after receipt of the work <br /> from the sub consultants including surveying, geotechnical and environmental. The estimated <br /> time for completion includes review time for City of La Porte's review, one draft review and <br /> one final review. We have based our scope of services and schedule assuming that the City of <br /> La Porte can provide us and our sub - consultants the right of entry to allow us to conduct our <br /> investigations. <br /> ADDITIONAL SERVICES <br /> Services requested and authorized by the City of La Porte which are not part of the above <br /> scope will be additional services. Work on additional services items will not begin until a <br /> written authorization and notice to proceed are signed and received. An additional scope and <br /> estimated budget will be presented accordingly prior to commencement of the additional <br /> services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.