My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-02-11 Drainage and Flooding Committee Meeting minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2011
>
05-02-11 Drainage and Flooding Committee Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:27 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Estimate for Geotechnical Engineering Services lierracon <br /> Drainage Ditch Improvements — Battleground Estates ® La Porte, Texas <br /> July 5, 2011 ® Terracon Document No. P91110111 <br /> Page 3 <br /> Schedule. We can initiate our field operations within three to five working days following <br /> authorization to proceed, if site access and weather conditions will permit. We anticipate completion <br /> of our services and submittal of our final report within about two weeks after completion of our field <br /> services. In situations where information is needed prior to submittal of our report, we can provide <br /> verbal information or recommendations for specific project requirements directly after we have <br /> completed our field and laboratory programs. <br /> C. COMPENSATION <br /> For the scope of work consisting of drilling footage of 55 feet, laboratory testing, and a report as <br /> outlined in this document, we estimate the following total costs. The estimated costs are presented <br /> in detail on the attached details of cost estimate. <br /> Task Cost Estimate <br /> Field Services $2,603.00 <br /> Laboratory Testing $1,005.00 <br /> Engineering Analysis & Reporting $1,882.00 <br /> Total Estimated Cost $5,490.00 <br /> The cost of our services for requested effort will not exceed this estimate unless the scope of <br /> services is modified with the approval of the client. <br /> Additional consultation (such as attendance on project meetings, conference calls, engineering <br /> analyses, review of project documents, etc.) requested will be performed on a time - and - material <br /> basis. The fee to provide additional consultation services will be invoiced in accordance with the <br /> attached unit rates in concurrence with your approval. Any project and /or scope changes requiring <br /> additional or revised analyses will also incur additional charges. We will provide you an estimate of <br /> additional charges for authorization prior to executing the scope changes. <br /> D. AUTHORIZATION <br /> Environmental Considerations. In an effort to reduce the potential for cross - contamination of <br /> subsurface media and exposure of site workers to contaminants that might be present at the site, <br /> Terracon requests that prior to mobilization to the site, the Client inform Terracon of known or <br /> suspected environmental conditions at or adjacent to the site. If adverse environmental conditions <br /> are present, additional expenses may be necessary to properly protect site workers and abandon <br /> borings that penetrate affected groundwater - bearing units. <br /> Reliable ® Responsive n Convenient RI Innovative <br />
The URL can be used to link to this page
Your browser does not support the video tag.