Laserfiche WebLink
Cost Estimate for Geotechnical Engineering Services 1 Frrac ®n <br /> Drainage Ditch Improvements — Battleground Estates si La Porte, Texas <br /> July 5, 2011 El Terracon Document No. P91110111 <br /> Page 5 <br /> Details of Cost Estimate <br /> Item Description Quantity Unit Rate Amount <br /> Field Services <br /> 1 ATV Drilling Rig Mobilization 1 each $417.00 $417.00 <br /> 2 Soil Boring, 0 - 15 ft 55 feet $16.00 $880.00 <br /> 3 ATV Drilling Surcharge 55 feet $6.00 $330.00 <br /> 4 Standby / Travel 2 hrs $146.00 $292.00 <br /> 5 Field Technician, Staking & Logging 6 hrs $50.00 $300.00 <br /> 6 Project Engineer, P.E. 4 hrs $96.00 $384.00 <br /> Sub -total for Field Exploration $2,603.00 <br /> Laboratory Testing <br /> 1 Liquid and Plastic Limits 8 each $53.00 $424.00 <br /> 2 Unconfined Compression 8 each $39.00 $312.00 <br /> 3 Moisture Content 8 each $8.00 $64.00 <br /> 4 Percent finer than the No. 200 Sieve 5 each $41.00 $205.00 <br /> Sub -total for Laboratory Testing $1,005.00 <br /> Engineering Analysis & Reporting <br /> 1 Principal Engineer, P.E. 2 hrs $167.00 $334.00 <br /> 2 Project Engineer, P.E. 15 hrs $96.00 $1,440.00 <br /> 3 Support Personnel 3 hrs $36.00 $108.00 <br /> Sub -total for Engineering Reports $1,882.00 <br /> Total Not to Exceed Cost $5,490.00 <br /> Reliable is Responsive of Convenient ® Innovative <br />