Laserfiche WebLink
Engineering Consultant Recommendations <br /> Project Description and Recommendation <br /> Battleground Estates Channel Improvements along South Boundary of Battleground <br /> Estates and potential Mitigation Pond to mitigate flows estimated <br /> at $849,000. <br /> Recommend requesting proposal for Preliminary Engineering <br /> Report from Klotz Associates and Proposal for Design Services <br /> from LJA Engineering, Inc. <br /> Shady River Channel Improvements along A104- 00 -00, Taylor Bayou Watershed, and <br /> potential Mitigation Pond to mitigate flows estimated at $361,000. <br /> Recommend requesting proposal for Design Services from Civil <br /> Tech Engineering, Inc. <br /> PER for F101 -06 -00 Excavation of approximately 200 Acre -Feet of unutilized portions of <br /> Northwest Park to relieve headwater flow from B106- 00 -00, Big Island <br /> Slough or re- direct flow for a portion of F101 -06 -00 from East to West <br /> utilizing detention prior to release in B106 -00 -00 estimated at $4.5 million. <br /> Recommend requesting proposal for Preliminary Engineering <br /> Report from Klotz, Associates, Inc. <br /> PER for 8112 -00 -00 Approximately 3000 feet of Channel Lining and Potential <br /> Mitigation Pond along B112 -00 -00 between Spencer Highway and <br /> Fairmont Parkway. <br /> Recommend requesting proposal for Preliminary Engineering <br /> report from Civil Tech Engineering, Inc. <br /> Committee member Engelken and Vice Chairman Clausen directed Garza to move forward with <br /> staff's recommendations. Chairman Mosteit directed the same, and further stated that it is good to <br /> have a relationship with Harris County Flood Control and is glad to see that the City does. The <br /> Committee recommended staff take their recommendations to City Council. <br /> 4. Receive update on the following Drainage Projects — J. Garza <br /> o De- silting Ditches <br /> o Brookglen Detention Ponds <br /> o Sheetflow Relief Structures <br /> o Oakhurst Outfall <br /> o Sunrise on Broadway <br /> o Battleview <br /> o East Main Street <br /> o F216 Linear Detention Phase <br /> o South 16 Street <br /> The following are the updates on the listed Construction and Design Projects: <br /> Construction Projects <br /> De- silting Ditches — Contractor has completed work on B- 106 -05 and started work on B- 106 -06. <br /> Once complete with B- 106 -06 they will mobilize to B -109, Third Street and Arizona. <br /> Page 2 of 3 <br /> May 2, 2011, Drainage and Flooding Committee Minutes <br />