My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-02-11 Drainage and Flooding Committee Meeting minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2011
>
05-02-11 Drainage and Flooding Committee Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:27 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
5/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
klotzO Fassociates <br /> 1160 Dairy Ashford, Suite 500 <br /> Houston, Texas 77079 <br /> T 281.589.7257 F 281.589.7309 <br /> July 5, 2011 houston.office @klotz.com <br /> Mr. Julian Garza Jr., P.E. <br /> Planning Department <br /> Senior Engineer <br /> City of La Porte <br /> 604 West Fairmont Parkway <br /> La Porte, Texas 77571 <br /> Re: Scope of work and budget for Preliminary Engineering Report to address flooding in <br /> the Battleground Estates area <br /> Klotz Associates Project No. 0127 <br /> Dear Mr. Garza: <br /> Klotz Associates is pleased to submit this proposal to prepare a Preliminary Engineering <br /> Report to address the flooding in the Battleground Estates area. The City of La Porte <br /> Flooding and Drainage Committee along with city staff have determined that a Preliminary <br /> Engineering Report is needed for the Battleground Estates area to develop specific <br /> information and recommendations on structural flooding within the Battleground Estates <br /> area. Listed below is the scope of work associated with the preparation of the Preliminary <br /> Engineering Report. We have included a detail scope of work below to provide the City with <br /> information on the details and approach to preparing the Preliminary Engineering Report. <br /> Some of the listed task items do not take much time and effort and some of the listed task <br /> items will take more time and effort to complete. <br /> Understanding of the Project <br /> The Battleground Estates subdivision drainage is influenced by multiple channels and by <br /> roadside ditch drainage. Each of the channels and the roadside ditches could impact the <br /> drainage within the subdivision. The goal is to evaluate channel F101-00-00 and the roadside <br /> ditch drainage system within the Battleground Estates area and to determine if channel <br /> improvements, improvements to areas of restriction, addition of sheet flow relief systems, <br /> detention or other improvements are needed to help reduce the flooding of structures. <br /> Hydrologic and hydraulic (H &H) analysis of the channels would be needed to document the <br /> possible change and to document the benefits and impacts to the adjacent channels. <br /> The Battleground Estates subdivision includes over 220 homes, 250 lots and about 230 <br /> location where roadside ditches and culverts drain the subdivision. The existing roadside <br /> ditches and culverts vary in size and elevation. We propose to survey the location, size and <br /> flow line of each of the exiting culverts within the subdivision and some downstream so we <br /> can use that information to determine which culverts meet appropriate criteria in terms of <br /> pipe size, flow line and channel size. We will then use the results of that analysis to make <br />
The URL can be used to link to this page
Your browser does not support the video tag.