Laserfiche WebLink
There were no questions from the Committee. <br />(d) Drainage Interconnect Project at Lakes at Fairmont Green — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on the Drainage Interconnect Project at Lakes <br />at Fairmont Green. <br />Chairman Martin asked which developer is doing the project. Mr. Wingate responded the <br />Brownstone Group. <br />(e) Bob's Gully — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Bob's Gully. There were no questions from <br />the Committee. <br />(f) 6th St., from Madison to W. Main Drainage Analysis — L. Wingate/D. Pennell. <br />City Engineer Lorenzo Wingate provided an update on 61 St., from Madison to W. Main Drainage <br />Analysis. There were no questions from the Committee. <br />(g) 8th Street & D. Storm Water Conveyance Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on 8th Street & D. Storm Water Conveyance <br />Improvements. There were no questions from the Committee. <br />(h) Little Cedar Bayou F216 Phase 11 Improvements — L. Wingatell). Pennell <br />City Engineer Lorenzo Wingate provided an update on Little Cedar Bayou F216 Phase 11 <br />Improvements. There were no questions from the Committee. <br />(I) Little Cedar Bayou F216 Phase III Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Little Cedar Bayou F216 Phase III <br />Improvements. <br />Vice -Chairman Earp, asked if the improvements are in the upcoming budget City Manager Corby <br />Alexander responded yes. <br />0) Browning & Golden Drainage Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Browning & Golden Drainage Improvements <br />and reported the project has been completed. There were no questions from the Committee. <br />(k) Airport On-site Drainage Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update Airport On-site Drainage Improvements and <br />reported the study has been completed. There were no questions from the Committee. <br />(1) Airport Off-site Drainage Improvements — L. Wingatell). Pennell <br />City Engineer Lorenzo Wingate provided an update Airport Off-site Drainage Improvements and <br />reported the study has been completed. There were no questions from the Committee. <br />Page 2 of 4 <br />June 11, 2018 <br />Drainage and Flooding Committee Minutes <br />