Laserfiche WebLink
Precinct Coordinator Jeremy Ratliff, with HCFCD, spoke and informed the committee of <br /> maintenance projects and presented a handout and a PowerPoint. He went over a brief history of <br /> the maintenance they have going on and some of the bond projects. <br /> Director of Engineering Alan Black, with HCFCD, spoke and advised many of the projects will need <br /> to be well chosen if the Bond Election passes, to get a prioritized list of projects needing to be done <br /> in La Porte. <br /> Vice-Chairman Earp commented the Committee will work with HCFCD and Harris County Precinct <br /> 2 in order to get a list of projects prioritized. Mr. Black suggested the City provide a list and meet to <br /> discuss the projects before the August Bond Election. <br /> Councilmember Zemanek asked whether it is feasible to get a pump station at Lomax F101-03-00 <br /> in order to get through the Pipeline Corridor. Mr. Black responded pump stations are the last resort <br /> due to pump stations having to be powered by electricity and when lines go down, they need a <br /> back-up generator; and there is also the factor of having to conduct routine maintenance of pump <br /> stations to assure they are pumping properly and not flooding downstream. <br /> Mr. Black provided information on funding sources for the City of La Porte. <br /> Councilmember Engelken commented he heard there may be a subdivision built at Fairmont and <br /> Red Buff that will increase blocked drainage in the Brookglen subdivision and asked what <br /> restrictions will the City of Pasadena have for detention facilities for the new subdivision. Mr. Black <br /> responded developments have to mitigate the increase flow in the form of storm water detention <br /> basins. <br /> Vice-Chairman Earp thanked everyone for attending the meeting to discuss flooding issues, and <br /> looks forward to meeting with them again. <br /> Vice-Chairman Earp address Don Pennell and Corby Alexander regarding what was requested at <br /> the last meeting, and that is to provide dates and costs on each of the items listed on the agenda, <br /> and where we are on each item. We need the dates, targets, approximate cost, so we can start <br /> figuring out funding and timing, and we want to look at it at every meeting from here on out. <br /> (b) Brookglen Subdivision— L. Wingate/D. Pennell <br /> (c) Bob's Gully— L. Wingate/D. Pennell <br /> (d) Lomax F101-03-00 Drainage Channel Feasibility Study— L. Wingate/D. Pennell <br /> (e) Little Cedar Bayou F216 Phase II Improvements — L. Wingate/D. Pennell <br /> (f) Battleground Estates Improvements — L. Wingate/D. Pennell <br /> (g) North P Street Culvert Improvement— L. Wingate/D. Pennell <br /> (h) Re-grading/Desilting H., L., & P., Streets —L. Wingate/D. Pennell <br /> (i) Bayside Terrace— L. Wingate/D. Pennell <br /> Page 3 of 4 <br /> July 9,2018 <br /> Drainage and Flooding Committee Minutes <br />