My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-12-23 DF
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2023
>
06-12-23 DF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2023 7:46:57 AM
Creation date
3/21/2025 2:28:50 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
150 acre-feet, Mr. Mayo said the engineer has been authorized to begin topographic <br /> survey on the expanded detention area, and noting there would be a presentation at the <br /> next Committee meeting. <br /> d. Presentation, discussion, and possible action regarding the Harris County Flood <br /> Control District's (HCFCD) and Harris County Precinct 2's current and future plans <br /> related to flooding in the City of La Porte. [Ray Mayo, Director of Public Works] <br /> Mr. Mayo said the consultant had provided an updated F216 report, which is under review. <br /> Harris County Flood Control District's Jonathan St. Romain said the environmental <br /> assessment has not been completed on the Brookglen north detention basin, which is <br /> necessary for federal funding, but he expected the project to be bid in early August and <br /> construction to begin on the north basin then. He also confirmed potential street closures <br /> would come before the Committee separately for each of the north and south basins and <br /> that HCFCD would not be pursuing the closure on Gladwyne. Member Engelken <br /> expressed concern about the poor quality of the mowing of the lots purchased by Harris <br /> County and his appreciation that Mr. St. Romain came out to the meeting. On F212, the <br /> channel from Broadway along Main to East B, Mr. St. Romain said they were in final design <br /> for that project. <br /> e. Presentation, discussion, and possible action regarding the status of current <br /> drainage projects. [Ray Mayo, Director of Public Works] <br /> Mr. Mayo note the preliminary engineering report was complete on the City's project in <br /> Brookglen and a summary would be presented at the next Committee meeting. He also <br /> noted engineers were looking at the issues for Sens at H Street and drainage on an <br /> undeveloped area adjacent to Battleview St. <br /> f. Presentation, discussion, and possible action to provide administrative staff of the <br /> City with direction, if necessary, regarding additional drainage concerns. [Ray <br /> Mayo, Director of Public Works] <br /> Member Williams shared her concern about the diversion of funds from the Valley View <br /> Project. Mr. Mayo noted the County evaluated the bridge and found it was not the drainage <br /> issue, thereby freeing up that money, and that HCFCD was also funding from a bond and <br /> other financial resources, so that they could possibly pay for up to 80% of the project. <br /> 4. SET NEXT MEETING <br /> The next meeting was set for July 10, 2023. <br /> 5. COMMITTEE COMMENT — Hear announcements concerning matters appearing on the <br /> agenda; items of community interest; and/or inquiries of staff regarding specific factual <br /> information or existing policy from the Committee members and City staff, for which no formal <br /> action will he discussed or taken. <br /> The Committee thanked Mr. Mayo and his staff for cleaning up the bar ditches along South <br /> Broadway. <br /> A P087?‘ <br /> A I J I1 RN The -etin•{was ad'ou: wit ourtYb�cntin at 5:40 p.m. <br /> /• <br /> i <br /> 1i9�.,.June 12,y 4fDrainage and Hooding Committee Minutes <br /> ��,Rq\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.