My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Final_Report-dated_06-16-2008
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Final_Report-dated_06-16-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:51:08 AM
Creation date
3/21/2025 2:29:05 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
6/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Bottonm <br />June 16, 2008 <br />Page 4 of 6 <br />k I o t z a s s o c i a t e s <br />Alternative 3 includes the placing of inlets at the entrance of the park to <br />collect the sheet flow from a larger storm event of Creekmont Subdivision <br />Section 2 and directing the flow with. storm sewer pipes to Big Island <br />Sough within a 10 foot easement that the City owns (see Exhibit 7). <br />Alternative 3 is a completely separate system that will convey only the <br />"Additional Drainage" Areas of 48.6 acres to Big Island Slough shown in <br />Exhibit 3. This system will go across the pipeline corridor that is to the <br />east of Creekrnont Park. A survey needs to be conducted before this <br />alternative can be finalized. It is assumed that the pipeline easement will <br />not interfere with the Alternative 3 storm sewer system, but if it does, a <br />siphon may be required to cross the pipeline corridor. This alternative will <br />not connect to North H Street or be in the 1R.ight=of=Way of North H Street <br />and will have its own outlet at Big Island Slough. Table 5 show the pipe <br />sues and cost estimated for the 5-, 10-, 25-, 50-, 100-year storms. <br />Alternative 3 will require HCFCD review and approval since new outfall <br />would be required. Same additional Right -of -Way and/or construction <br />easement may be required for this alternative and the costs for these are <br />not included in the cost estimate. <br />+'fir � �� f � �- f• r �: a <br />The initial assessment of the data shows that any of the alternatives will collect <br />the sheet flow from a larger storm event from the Creekmont Subdivision Section <br />2 at the location of the Creekiriont Park entrance. The alternatives show possible <br />ways to convey this flow to provide some relief Creekinont Subdivision Section <br />2. Alternative 1 consists of 910 feet of pipe that will connect to the existing storm <br />sewer on North H Street. The total cost estimate for alternative I will range from <br />$344,000 to $428,000 depending on what storm event is chosen (refer to Table 6 <br />for details). Alternative 2 consists of 1,885 feet of pipe that will connect to North <br />H Street and run parallel on North H Street. The total cost estimate for alternative <br />2 will range from $725,000 to $1,294,000 depending on what storm event is <br />chosen (refer to Table 7 for details). Alternative 3 consists of 1,322 feet of pipe <br />that will outfall into Big Island Slough. The total cost estimate for alternative 3 <br />ranges from $474,000 to $571,000 depending on what storm event is chosen <br />(refer to Table 8 for details). <br />
The URL can be used to link to this page
Your browser does not support the video tag.