My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Drainage_and_Flooding_Report-dated_10_03_2008
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Drainage_and_Flooding_Report-dated_10_03_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:54:06 AM
Creation date
3/21/2025 2:29:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
10/3/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Bottoms, City Manager <br />October 1, 2008 <br />Page 5 of 31 <br />k 1 0 t Z a s s o c i a t e s <br />Use of a 5-year frequency for sewer design would lessen the likelihood of street <br />flooding for small storm events; however, sewer system development or <br />i■ costs would ■` increased. <br />In application of the frequency standards (whether they be a 3-year or a 5-year <br />frequency), caution should be exercised in selection of rainfall intensity -duration - <br />frequency parameters. Different entities have different parameters describing <br />rainfall characteristics, and some data does not currently recognized information <br />developed from the Tropical Storm Allison Recovery Project (TSARP). The <br />parameters for describing rainfall for Harris County, City of Houston, La Porte, <br />Harris County Flood Control District (HFCD), and the Texas Department of <br />Transportation (TxDOT) are compared in Appendix B. The most significant <br />difference in these data are the rainfall intensity duration data for TxDOT as <br />compared to that for Harris County and the City of Houston. <br />As part of storm sewer design, tailwater levels need to be recognized. The City <br />criteria uses a 25-year frequency level for the outfall channel. For non -tidally <br />influenced outfalls, this level is considered to be adequate unless the 25-year <br />frequency positions the hydraulic grade line (HGL) at the outfall to be less than <br />the top of outfall pipe, in which case the calculated hydraulic grade line should be <br />set at the top of the pipe. Minor losses should be included in the sizing of and <br />HGL calculations for existing and proposed storm sewer systems. <br />For tidally influence outtalls, recogruition should be aiven to the effects of tUe—sori <br />sewer design for those sewer facilities discharging directly to tidal -influenced <br />waters (i.e., directly to Galveston Bay or major drainage ditches which are <br />signcantly affected by tidal levels). For outfalls subject to tidal variation, it is <br />recommended that the outfall tailwater used for sewer design purposes be set at <br />the higher of 1) 25-year frequency level in the receiving water (i.e., the level <br />based upon non -tidal conditions), or 2) the mean high tide (also referred to as the <br />mean high water). Based upon tidal variation at Morgans Point on Barbours Cul <br />(based upon data from National Ocean Service, National Oceanic and <br />Atmosy,heric Administration, the mean high tide is wild'! feet above <br />mean sea level. <br />2.4.2 Provision of Sheet Flow Paths <br />The City drainage criteria do not specifically address sheet flow paths for <br />drainage relief of accumulated waters which cannot be readily drained by a <br />combination of sewers systems with curbed streets or roadside ditches. Sheet <br />flow paths allow for drainage via overland flow along a directed, controlled <br />[#,,athway which does not adversely affect residential or commercial structures. <br />These pathways are dedicated for this purpose using easements or rights -of -way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.