My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Klotz Associates-addendum 03-26-10
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Klotz Associates-addendum 03-26-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2010 1:51:45 PM
Creation date
3/21/2025 2:29:18 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
3/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />k lot z 4~~ ass 0 cia t e 5 <br /> <br />Mr. Ron Bottoms <br />March 16,2009 <br />Page 6 of6 <br /> <br />SCHEDULE <br /> <br />It is expected that survey and preliminary engineering will be complete within four (4) weeks of <br />authorization and notice to proceed. Final design and preparation of bid documents is expected <br />to be complete in four (4) weeks. Design engineering services for construction of the sheet flow <br />relief swales and storm sewer outfall improvements will be completed within nine (9) weeks of <br />receipt of written authorization to proceed, including review submittals to the County. <br /> <br />Advertisement and sale of bid packages is estimated at two (2) weeks and bid phase services <br />should be completed within four (4) weeks from the date of written authorization. <br /> <br />Three (3) months is estimated to complete construction of these improvements after the contract <br />is awarded to the winning bidder. Construction phase services shall be provided as outlined <br />herein. <br /> <br />CLOSING <br /> <br />All terms and conditions remain in place as per our prior Letter of Agreement authorized <br />February 6, 2009 (see Attachment). <br /> <br />If this proposal meets with your approval, please sign the attached contracts and return one (1) <br />original to Klotz Associates. We are prepared to proceed within 24-hours of receipt of your <br />written authorization to proceed. <br /> <br />Thank you for considering Klotz Associates, Inc. for these community improvements for the <br />City of La Porte, Texas. Please do not hesitate to contact Bri dicks, P.E., Bob Johnson, P.E. <br />or me with questions regarding this addendum. <br /> <br /> <br />3/U/07 <br /> <br />Ron Bottoms Date <br />City Manager <br /> <br />!8Jt8frtf Om) . <br /> <br />Print Name <br /> <br /> <br />Michael A. Ogde <br />Sr. Vice President <br /> <br />MAO:az <br /> <br />Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.