Laserfiche WebLink
<br />k lot z 4~~ ass 0 cia t e 5 <br /> <br />Mr. Ron Bottoms <br />March 16,2009 <br />Page 4 of6 <br /> <br />2. Maintain a bidders list. The scope includes printing and distribution of bid sets <br />(including reproduction expenses). Bidders are responsible for pick up and delivery of <br />bid sets as directed by the City. <br />3. Participate in the pre-bid conference for prospective bidders <br />4. Answer questions of bidders and suppliers during the bid preparation period <br />5. Post addenda to drawings and project manual and issue addenda, as required <br />6. Attend bid opening <br />7. Check bids for errors, responsiveness and tabulate results <br />8. Review the qualifications of the apparent low bidder if unknown <br />9. Issue a recommendation for award <br />10. Send contract documents to Contractor and City for signatures. City will send signed <br />contract to the Contractor <br /> <br />Construction Phase Services <br /> <br />11. Participate in the preconstruction meeting <br />12. Receive, review and forward monthly pay requests to City of La Porte <br />13. Review & Approval of Contractor Submittals, including shop drawings & concrete mix <br />designs <br />14. Respond to contractor's requests for information (RFIs) by phone and emai1 <br />15. Address change order requests <br />16. Perform up to six (6) site visits to inspect work performed to date, each month and verify <br />contractor pay requests. Construction schedule is estimated to be six (6) months. Klotz <br />Associates will prepare monthly status reports included with invoicing each month that <br />will include action items and percent complete from City for contractor's pay request. <br />The City will provide day-to-day inspections of construction for regulatory compliance <br />and percent complete estimates. <br />17. Conduct one (l) inspection at suhstantial completion; prepare punch list and one (1) fmal <br />inspection. Contractor is responsible for submitting to HCPID Permits, Notification of <br />Substan~ial Completion, in writing <br />18. Contractor is responsible for maintaining record drawings for submittal after construction <br /> <br />As part of this agreement, sub-consultant services considered to be additional assignments for <br />this project are included in the Scope of Additional Services as well. Klotz Associates will <br />provide these additional sub-consultant services as follows; <br />