My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Klotz Draft Report for Fairmont Park East and Brookglen 072809
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Klotz Draft Report for Fairmont Park East and Brookglen 072809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:55:19 AM
Creation date
3/21/2025 2:29:18 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
7/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Bottoms <br />July 22, 2009 <br />Page 4 of 12 <br />Study Background <br />Interconnect B109-03-00: <br />Original purpose of the interconnect B 109-03 -00 was to divert flood waters along B 112- <br />02-00 to the improved downstream channel B109-00-00 and reduce flooding in <br />Brookglen Subdivision and Spencer Highway Estates Subdivision during a 100-year <br />storm event. According to a report entitled, Hydrologic and Hydraulic Study for <br />Interconnect of HCFC Unit B112-02-00 to Unit B109-00-00 and HCFC Regional <br />Detention Site Unit B512-01-00, by WSA in April 1997; HCFCD constructed an <br />interconnect, now called B109-03-00, between Tributary 1.78 to Willow Springs Bayou <br />(B 112-02-00) and Spring Gully (upper B 109-00-00) as an interim solution to "reduce <br />widespread flooding" along B 112-00-00 and B 112-02-00. Prior to construction of <br />interconnect B109-03-00, B112-02-00 drained all of subwatershed B11202A, an area <br />approximately 1,612 acres located in the City of Deer Park, eastern limits and north of <br />City of La Porte. <br />The limits of B109-03-00 are between B112-02-00 and approximately 700 feet to the <br />south of B112-02-00 and just south of Carlow Street to the east approximately 900 feet to <br />B109-00-00. Construction of the interconnect B109-03-00 was completed in November <br />1993 in accordance to plans prepared by J.A. Costanza & Associated Engineering, Inc., <br />dated February 1992, see "Data Collected and Prior Reports". <br />The disconnect of B 112-02-00 at Canada Street was performed to divert all flows coming <br />from B512 01 00 into B 109-00-00 under the ultimate development plan in order to have <br />no impacts to Armand Bwith the <br />interconnect in place and 1997 develo meat. <br />HCFCD Detention Basin B512-01-00: <br />originally, an interim plan recommended by WSA in 1997, proposed detention basin <br />B512-01-00 serve to provide: (1) Downstream flood protection along B112-02-00 and <br />B 112-00-00, "primarily" in Brookglen Subdivision and Spencer Highway Estates <br />Subdivision, (2) Mitigate impacts along Armand Bayou (B 100-00-00) from constructing <br />the interconnect B109-03-00; (3) Provide detention required from constructing East <br />Boulevard Roadway. According to WSA's 1997 report, the interim plan provided flood <br />protection along B 112-02-00 for a 10- to 25-year storm event level between Spencer <br />Highway and the interconnect. The interconnect split the 100-year flows from B512-01- <br />00 on the order of 75% (about 760 cfs) of the flow was added to B109-00-00, (and 75% <br />removed from discharging into B 112-00-00) and 25% (about 254 cfs) continued <br />downstream in B112-02-00. Interim mitigation plan provided 351 ac-ft that outfalls <br />using 2-7' x 6' RCB's under an 80-foot spillway discharging 1015 cfs into B112-02-00 at <br />a depth of 9.5-feet. <br />