My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Klotz Draft Report for Fairmont Park East and Brookglen 072809
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
Klotz Draft Report for Fairmont Park East and Brookglen 072809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:55:19 AM
Creation date
3/21/2025 2:29:18 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
7/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Bottoms <br />July 22, 2009 <br />Page 8 of 12 <br />b. Location D2 — 8.0 ac-ft of storage is available for detention along B112- <br />00-00 from 1.14 acre City owned property on Bandridge Road. This <br />location is currently undeveloped. <br />c. Location D3 — 26.0 ac-ft of storage is available for detention along B 112- <br />00-00 from 2.5 acres the City owns between Somerton Drive and B112- <br />00-00. This is an undeveloped open area in the park area that is bound by <br />the public pool to the north, utility corridor to the south, B 112-00-00 to the <br />West and Somerton Drive along the east. <br />d. Location D4 — 8.0 ac-ft of storage is available for detention at the <br />confluence of B 109-03-00 and B 109-00-00 in an undeveloped area that is <br />0.8-acre in size. <br />2) Interconnect Spring Gully (HCFCD Unit B109-03-00) and Tributary 1.78 to <br />Willow Springs Bayou (HCFCD Unit B 112-02-00). This includes connecting the <br />east end of B 112-02-00 to B 109-03-00 and local channel improvements. <br />3) Disconnect Willow Springs Bayou (HCFCD Unit B 112-00-00) and Tributary 1.78 <br />to Willow Springs Bayou (HCFCD Unit B112-02-00). This means damming off <br />the west end, or disconnecting, B112-02-00 from B112-00-00 (Willow Springs <br />Bayou). <br />4) Add a low flow drain pipe at the disconnect to drain B 112-02-00. Install a low <br />flow pipe at the proposed disconnect to drain B 112-02-00 into B112-00-00 during <br />periods of no rain or when B109-03-00 empties. No channel improvements are <br />proposed for B 112-02-00 nor is the existing flow line modified. <br />5) Add Five (5) 1 Vx 10' reinforced concrete boxes (KCB's) and local channel <br />improvements at B 112-02-00 and Canada Street. <br />6) Spring Gully (B109-03-00 & B109-00-00) Channel Improvements between the <br />proposed interconnect ofB112-02-00 and B109-03-00 to approximately 4,800- <br />feet south to Future HCFCD Detention Basin B509-03-00 (36.0 ac-ft of channel <br />excavation). Typical section is a trapezoidal shape about 14-feet deep with a <br />bottom width that ranges between 5-feet to 30-feet and 4:1 side slopes. <br />7) Interim detention in Future HCFCD Detention Basin Unit B509-03-00 of <br />approximately 35.0 ac-ft with a stabilized earthen inflow weir and outfall pipe. <br />Mitigation of the increases in flow from B 112-02-00 and additional conveyance <br />in B 109-00-00 will be handled by constructing a portion of detention basin B509- <br />03-00 with temporary inflow and outfall structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.