Laserfiche WebLink
<br />e <br /> <br />_ <br /> <br />FILL DIRT REVIEW COMMITTEE MEETING <br />OF <br />July 24, 2003 <br /> <br />IN PROGRESS <br /> <br />1. Fee to be assessed for each permit. <br /> <br />. Suggested fee of $25.00 for first 49 loads and $2.00 for each additional <br />load. <br /> <br />2. Fee to be assessed for repetitive trips of major haul routes. <br /> <br />. Information to be researched and presented to committee in the future <br /> <br />3. Final overland slopes for final grading on small lots. <br /> <br />. Could maybe used FHA numbers for small lots but will need to research <br />possible range for large lots. <br /> <br />4. SWPPP for small load (6-49) projects including possible suggestions on <br />revegetation. <br /> <br />. Possible use of 2 rows of sod around filled area. <br />. Additionally, owner must follow up immediately with sprigging, sodding, <br />seeding, hydromulching, or turf establishment in such a manner that <br />insures establishment of vegetation within 90 days. <br />