Laserfiche WebLink
<br />EXHIBIT A <br />TO <br />ORDINANCE <br /> <br />e <br /> <br />- <br /> <br />444-A <br /> <br /> All Lots Small Lots Large Lots <br /> PERMIT REQUIREMENTS AND CONDITIONS (less than 1 acrel (1 acre or more) <br /> 1-5 Loads 6-49 Loads 50 and more Loads 6-49 Loads 50 and more Loads <br />1 Permit Reauired * * * * <br />2 Permit Fee Assessed * * * * <br />3 180 Dav Permit for Project Completion * * * * <br />4 Spreading of Delivered Fill Must Beain within 30 Days * * * * * <br />5 For Open Ditch Roadways Maximum Fill to be 6 inches below * * * * <br />top of adjacent crown of road <br />6 Recommended overland slope for lot grading to be 0.2%- * * <br />0.75% <br />SA For Curb & Gutter Streets, Grade Fill at 0.2%-0.75% toward * <br />street <br />7 For Lots Abutting an Alley Way, Match the Grade of the Alley * * <br />and Grade to Drain Toward Street <br />8 Grading & Drainage Plan submitted signed and sealed by * * <br />Professional Engineer licensed in the State of Texas <br />SA Storm Water Pollution Prevention Plan and Revegetation * * <br />Plan submitted <br />8B Demonstration that Watershed is Not Being Adversely * * <br />Impacted <br />8C Grade of swales to be customedJenaineered for each site * * <br />9 Sketch, Surveyor Site Plan Showing Proposed Fill Placement * .See Item 8 * .See Item 8 <br />and Location of Proposed Drainaae drawn to scale <br />10 Silt Prevention and Reveaetation Dlan reauired .See Notes 3&4 .See Item SA .See Notes 3&4 .See Item 8A <br />11 1 ft Top of Bank Swale Offset from Prooertv Line * * <br />12 5 ft TOD of Bank Swale Offset from Property Line * * <br />13 No Fill Unloaded within 15 ft of ProDertv Line * * <br />14 No Fill Unloaded within 5 ft of ProDerty Line * * <br />15 Address for Site Required And Fill Must be Delivered to this . * * * <br />address <br />16 Any deviation from these permit requirements Shall be Review . * * . <br />and Approved By the City <br /> <br />Regulation <br /> <br />Note: <br />1 No dump trucks larger than 12 CY dump trucks shall be allowed for use in deliver to addresses off truck routes. <br />2 Only one Fill Dirt Permit will be issued for anyone property or address over a 180 day span. <br />3 Silt prevention plan shall at a minimum consist of silt fencing and/or block sodding two rows of sod wide along the leading edge of the filled area. <br />4 Revegetation shall consist of seeding, sprigging, sodding, turf establishment (or combination thereof) that produces an effective vegetative cover of 75% <br />within 90 days. <br /> <br />Information, Activity or <br /> <br />* = Required <br />