Laserfiche WebLink
<br />FIRE CODE REVIEW MINUTES - AUGUST 11, 1999 CONT: <br /> <br />PAGE 2 OF 4 <br /> <br />4. REVIEW FUEL TANK REOUEST: MR. EARL WEBB REPRESENTING U-FUEL, <br />SAN ANTONIO, TEXAS AND MR. RICHARD CANSLER, REPRESENTING CIVIL <br />CONCEPTS, INC., PASADENA, TEXAS MADE PRESNT ATIONS ON BEHALF OF <br />HARVEY RIHN AVIATION, LA PORTE, TO INSTALL AN 5,000 GALLON ABOVE <br />GROUND SECONDARY CONTAINMENT FUEL SYSTEM AT THAT LOCATION. <br /> <br />DURING THE PRESENTATIONS THE FOLLOWING REQUESTS WERE <br />REVIEWED AND APPROVED BY MEMBERS AND PRESENTERS: <br /> <br />1. NEEDED CORNER BOLLARDS WILL BE HIGHER THAN THE NORMAL 3' <br />HEIGHT DUE TO THE CONCERN OF POSSIBILITY OF THE WINGS OF THE <br />AIRPLANE BEING ABLE TO HIT THE PUMP AREA. <br /> <br />NOTE: CORNER BOLLARDS CAN BE USED TO INSTALL LIGHT FIXTURES ON <br />AT A LATER DATE. <br /> <br />2. A GROUND LEVEL (BOTTOM LOAD) FILL SYSTEM WILL BE USED <br />INSTEAD OF THE 7 GALLON OVERFILL CONTAINMENT BOX ON TOP OF <br />THE TANK. <br /> <br />3. EXTERIOR TANK COATING (EPOXY PAINT) WILL BE REPLACED WITH AN <br />POLYURETHANE PAINT. <br /> <br />4. THE PROPOSED 24 HOUR OPERATION REQUIREMENTS WILL NOT BE <br />REQUIRED AT THIS TIME. <br /> <br />NOTE: WHEN THE OPERATOR CONTACTS THIS OFFICER WITH A 24-HOUR <br />REQUEST, ALL CODE REQUIREMENTS WILL BE MET. <br /> <br />A MOTION WAS MADE BY TOM HAYES TO APPROVE THE REQUEST WITH <br />THE ABOVE LISTED ITEMS. SECONDED BY EMERY FARKAS. <br /> <br />YES VOTES RECEIVED: BROWDER, HAYES, FARKAS, BRECHTEL, CRAFT, <br />HEINTSCHEL AND BRAUCHER. <br /> <br />NO VOTES RECEIVED: NONE <br /> <br />MOTION CARRIED. <br />