Laserfiche WebLink
<br />I~' <br /> <br />FIRE CODE REVIEW MINUTES - DECEMBER 6, 2000 CONT. <br /> <br />PAGE 2 OF 3 <br /> <br />4. REVIEW REQUEST BY UNION PACIFIC RAILROAD FOR A VARIANCE <br />REGARDING THE STORAGE OF DIESEL FUEL IN 2 ABOVEGROUND FUEL <br />STORAGE TANKS. <br /> <br />SECRETARY HICKENBOTTOM PASSED OUT A COpy OF THE LETTER OF <br />REQUEST HE HAD RECEIVED FROM MR. BRADLEY REID, MANAGER - <br />MECHANICAL SYSTEMS DESIGN FOR THE UNION PACIFIC RAILROAD. <br />HICKENBOTTOM THEN REVIEWED WITH THE COMMITTEE THEIR CURRENT <br />POLICY FOR THE STORAGE OF DIESEL FUEL IN AN ABOVEGROUND SINGLE <br />WALL FUEL STORAGE TANK. A DISCUSSION THEN FOLLOWED. <br /> <br />A MOTION WAS MADE BY BRYAN MOORE THAT THE RAILROADS REQUEST <br />BE APPROVED WITH THE FOLLOWING CONDITIONS: <br /> <br />SECONDED BY FLOYD CRAFT. <br /> <br />1. PRIOR TO ANY WORK STARTING, THE FIRE MARSHAL RECEIVE FROM A <br />STATE OF TEXAS LICENSED ENGINEER, A SEALED LETTER THAT <br />STATES HE HAS PERSONALLY INSPECTED THE CURRENT DIKE AND IN <br />HIS PROFESSIONAL OPINION HAS DETERMINED THE CURRENT DIKE <br />AND CONCRETE SLAB ARE BOTH STRUCTURALLY SOUND AND THE <br />DIKE WILL CONTAIN AT LEAST 110% OF THE CAPACITY OF BOTH OF <br />THE NEW TANKS. <br /> <br />2. NO ADDITIONAL TANKS WILL BE ADDED TO THE DIKE AREA WITHOUT <br />COMMITTEE REVIEW AND APPROVAL. <br /> <br />3. NO TANK SIZE CHANGE WILL OCCUR WITHOUT COMMITTEE REVIEW <br />AND APPROVAL. <br /> <br />4. INSTALL A 7 GALLON REMOTE OVERFILL CONTAINMENT BOX/WITH <br />STAND. <br /> <br />5. ALL OTHER POLICY REQUIREMENTS BE MET, EXCEPT AS MODIFIED <br />HEREIN. <br /> <br />YES VOTES RECEIVED: BROWDER, MOORE, CRAFT, HAYES, LUNA. <br /> <br />NO VOTES RECEIVED: NONE <br /> <br />MOTION CARRIED. <br />