My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-10-1988 Meeting
LaPorte
>
City Secretary
>
Minutes
>
Golf Course Advisory Board
>
1980's
>
1988
>
03-10-1988 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 1:47:14 PM
Creation date
3/21/2025 2:39:28 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Golf Course Advisory Board
Meeting Doc Type
Minutes
Date
3/10/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ITEMS FOR GOLF COURSE CONTRACTOR TO COMPLETE <br />1) Finish drainage areas which have been identified by Jay Riviere <br />and City Staff. <br />2) Some fairways and green slopes will need some more 419 grass <br />added. All of these areas ~•rill be done after we can spray the <br />whole course and begin to eliminate the weeds. By doing this we <br />will be able to identify the weak areas and be more specific on <br />where to apply the grass. <br />3) There are a few areas in the rough that need to be seeded. These <br />areas are the drainage areas that are being worked on and some <br />mounds. <br />4) Fix or patch cart paths damaged by construction. <br />• 5) Repair leaking weir on Teo. 2 <br />6) Install main controller for water system. (Can't be done until <br />maintenance building is complete). <br />After contractor is satisfied with his work for completion of the <br />course, a final inspection will be made by Jay Riviere and staff. <br />AO/nb <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.