My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-23-1988 Meeting
LaPorte
>
City Secretary
>
Minutes
>
Golf Course Advisory Board
>
1980's
>
1988
>
06-23-1988 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 1:47:14 PM
Creation date
3/21/2025 2:39:30 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Golf Course Advisory Board
Meeting Doc Type
Minutes
Date
6/23/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GOLF COURSE ADVISORY BOARD MEETING <br />MItdUTES OF JUNE 23, 1988 <br />PAGE 2 <br />Joel informed the Board that Trident Construction has <br />come back in and repaired the cart paths that were <br />defective. The south end of the paths that was <br />considered the most critical has been replaced, without <br />any damage to the drainage situation. <br />The clubhouse foundation is poured and they are going up <br />with the framing construction right now. The cart <br />storage building foundation was poured last week, the <br />maintenance building foundation was poured this <br />morning. The time table for these buildings is around <br />the 15th-20th of July, and all seems to be on schedule. <br />The golf carts were completed Monday and they are <br />waiting for our ok for shipment. <br />• <br />Alex told the Board that he would prefer to have <br />facilities at the course before opening the "driving <br />range". The portable building has been moved in for the <br />temporary office/pro shop and when it has been checked <br />out and the electricity is on, then it would be feasible <br />to open the "driving range", a date of July 15th was <br />targeted for this. There will be a charge for using the <br />range and this fee will be set by Alex. <br />Richard Hayes asked if there has been any decisions <br />about securing the course a little more in regards to <br />fencing? Joel told him that the gates for across the <br />front entrance have been ordered, these will be put in <br />after the gas line is placed. Additional fencing on the <br />4Jharton-4Jeems side will be done with a gate for the <br />larger pieces of equipment to go through. The fencing <br />will be barb-wire or chain link if the budget will <br />allow. <br />• <br />ITEM N0. 4: RFP FOR CONCESSIONAIRE FOR CLUBHOUSE. <br />Joel informed the Board that the "RFP" for the <br />Concessionaire would be going out within the next week <br />for the Bay Forest clubhouse. They will be expected to <br />supply food, beverage,and concession items for the golf <br />course. They will also provide all equipment for <br />cooking, along with a freezer, refrigerator, ice <br />machines (2), hand sink, stainless steel tables, <br />matching tables and chairs to accommondate a minimum of <br />60 people. They will also provide insurance (i.e. <br />6Jorker's Compensation, comprehensive general liability, <br />comprehensive automobile liability). See attached copy <br />of the proposal for all the specifics. <br />
The URL can be used to link to this page
Your browser does not support the video tag.