Laserfiche WebLink
<br />Exhibit "e" <br /> <br />La Porte Area Water Authority <br />6.0 mgd Water Treatment Plant <br />Cost Alternatives <br /> <br />Probable Cost Surm1a.l:y <br />(Cost in rrhousands $) <br />Treatnent Plant <br />In La Porte Using Treat Water <br />CWA Water' Fl:om SEWPP <br /> <br />Raw Water Pump Station - Lynchburg $ 268*1 $ I <br />Engineering (Raw Water Pump Station) 25*1 I <br />Construction of Water Plant 5,800 7,055 <br />Engineering Cost - Plant 657 I <br />Raw Waterline (OVA) 500 I <br />Engineering Cost - Raw Waterline 86 I <br />Land 200 I <br />Inline Bcoster Station - La Porte NR 100 <br />Engineering - Booster Station NR 18 <br />Construction Cost Treated Water SuWly NR 1,820 <br />Engineering Cost ('lWS) NR 210 <br />Construction Cost Water Transmission Line 2,117 2,220 <br />Engineering Cost (wrL) 261 265 <br />'lbtal Construction & Engineering Costs $9,914 $11,668 <br /> <br />Notes: <br /> <br />I - Included <br /> <br />m - Not Required <br /> <br />*1 - Considers 6 mgd of 227 mgd capacity for addition to Lyndlburg <br />facili ty (see Attachrrent "A"). <br />