Laserfiche WebLink
<br />Exlnblt "c" <br /> <br />i <br /> <br />La Porte Area Water Authority <br />6.0 mgd Water Treatment Plant <br />Cost Alternatives <br /> <br />o~t\ <br />O\,r <br /> <br />Prd:>able Cost Stmtnal:y <br />(Cost in 'Ihousands $) <br />Treabrent Plant <br />In La Porte Using Treat Water <br />CWA water' F'l:an SEWPP <br /> <br />Raw Water Pump Statioo - Lyndlbw:g $ 268*1 $ I <br />Engineering (Raw Water Pump Station) 25*1 I <br />Construction of Water Plant 5,800 7,055 <br />Engineering Cost - Plant 657 I <br />Raw Waterline (CWA) 500 I <br />Engineering COst - Raw Waterline 86 I <br />Land 200 I <br />Inline Booster Station - La Porte NR 100 <br />Engineering - Booster Station NR 18 <br />Construction Cost Treated Water SUWly NR 1,820 <br />Engineering Cost ('lWS) NR 210 <br />Constructioo rust Water Transmissioo Line 2,117 2,220 <br />Engineering Cost (wrL) 261 265 <br />Total Construction & Engineering Costs $9,914 $1l,668 <br />.. <br /> <br />Notes: <br /> <br />I - Included <br /> <br />m - Not Re:;Iuired <br /> <br />*1 - cansiders 6 mgd of 227 mgd capacity for additioo to Lyndlburg <br />facility (see Attachrrent "A"). <br />