Laserfiche WebLink
<br />TurnerCollieC6Braden Inc. <br /> <br />H. CECIL ALLEN <br />VICE PRESIDENT <br /> <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 780-4100 <br />TElEX 774185 TCD HOU <br /> <br />September 24, 1986 <br /> <br />La Porte Area Water Authority <br />P. o. Box 1115 <br />La Porte, Texas 77571 <br /> <br />Attention: Mr. Jack OWen <br /> <br />Re: Water Supply and Treatment Alternatives <br />Cost Comparison <br />Turner Collie & Braden Job No. 13-28000-040 <br /> <br />Gentlemen: <br /> <br />In accordance with your directions, we have prepared a <br />side-by-side comparison of costs for three water supply <br />and treatment alternatives to serve the La Porte Area <br />Water Authority. The bases of these three alternative <br />plans are: <br /> <br />1) construction of a new 6 mgd La Porte Area <br />Water Authority water treatment plant in <br />the City of La Porte (LPAWA) <br /> <br />2) purchase of 6 mgd of treated water from <br />the proposed City of Houston Southeast <br />Water Purification Plant (SEWPP) <br /> <br />3) purchase of 6 mgd of treated water from <br />a proposed water treatment plant in the <br />City of Deer Park (Deer Park). <br /> <br />I <br /> <br />The comparisons are based on recent (8-4-86) estimates of <br />costs for the LPAWA and SEWPP prepared for the Authority <br />by Turner Collie & Braden and on a letter report dated <br />9-17-86 prepared for Deer Park by Klotz/Associates, Inc. <br />The cost estimates have been adjusted to reflect a 6 mgd <br />capacity for each alternative, and any differences between <br />the estimates have been evaluated and corrected so that <br />the comparisons are for similar facilities in each alter- <br />native. <br /> <br />CONSULTING ENGINEERS · TEXAS AUSTIN/DALLAS/I 'aUSTON/PORT ARTHUR COLORADO DENVER <br />