Laserfiche WebLink
<br />TABLE 1 - CAPITA.... COSTS <br /> <br /> LP1\WA SEWPP DEER PARK <br />TREMMENT PLANT $ 4,800,000 $ 7,055,000 $ 4,380,000 <br />FIN. WATER PUMP STATICN 350,000 100,000 350,000 (1) <br />S'l'OOJIGE FJlCILITIES 300,000 I 582,000 <br />YAK> PIPING 200,000 I I <br />SITE ~RK 150,000 I I <br />lAND CX8I' 200,000 I 360,000 <br />CWA- LYNatBt.JR; P. S. 293,000 I 293,000 (1) <br />~-RAW WATERLINE 500,000 I NR (2) <br />TREATED WATERLINE NR 1,820,000 1,440,000(3) <br />WATER TRANSMISSIoo LINE 2,117,000 2,220,000 2,117,000 <br />ENGINEERING-PLANT 657,000 I 744,300 <br /> -FIN. WATER P.S. I 18,000 33,000 <br /> -RAW WATERLINE 86,000 I NR (2) <br /> -TREATED WATERLINE NR 210,000 177,000(3) <br /> -WATER TRANS. LINE 261,000 265,000 261,000 <br />CXNrINGFN::IES I I 447,800 <br />IB;AL & FISCAL 180,100 (4) I 180,100 <br /> $10,094,100 $11,688,000 $11,368,200 <br /> <br />I - INCWDED IN 0l'HER CCST ITEMS <br />NR - Nal' REUJIRED <br />(1) - ASSUMED cn:3T EQUAL TO ESTIMATE FOR IPAWA FACILITY <br />(2) - ASSUMED BASED 00 PI.l\NT SITE AroACENT 'ill CWA LINE <br />(3) - CALCUIATED BASED 00 ASSUMED DEER PARK PI.l\NT IDCATICN <br />(4) - ASSUMED CCST EQUAL 'ill ESTIMATE FOR DEER PARK FACILITY <br /> <br />TurnerCoIlie0Braden Inc. <br />