Laserfiche WebLink
<br />KL01Z / 6.~ "CI6.TES, INC. <br />Consulting Enginee. <br /> <br />La Porte - Deer Park. <br /> <br />A current need for 10 MGD treatment is assumed to <br /> <br />provide 4 MGD for Deer Park and an additional 6 MGD for the <br /> <br />City of La Porte. <br /> <br />Proposed facilities considered for a current demand of <br /> <br />10 MGD consist of treating units and 2 MG ground storage. <br /> <br />Site requirements included in this concept provide for an <br /> <br />ultimate production requirement of 12 MGD for Deer Park, 12 MGD <br /> <br />for La Porte, and 6 MG ground storage. <br /> <br />Basic design concepts for either quantity, 4 MGD or 10 MGD, <br /> <br />consist of on site storage necessary for filter backwash and <br /> <br />proposed treatment facility design giving consideration to <br /> <br />hydraulic <br /> <br />requirements <br /> <br />for <br /> <br />ultimate <br /> <br />production. <br /> <br />Either <br /> <br />production requirement is to be provided using dual treatment <br /> <br />units necessary for maintenance without total production shut <br /> <br />down. <br /> <br />A brief description of additional proposed design features <br /> <br />is included in related cost estimates as follows. <br />