My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-12-1987 Meeting
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
05-12-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
3/21/2025 2:41:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
5/12/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> x /r R <br />~L-S 4/~~ ~~~~ ~O 1 y~^ <br />RESOLUTION AUTHORIZING APPLICATION TO THE <br />TEXAS WATER COMMISSION <br />FOR APPROVAL OF PROJECT AND BONDS <br />WHEREAS, La Porte Area Water Authority (the "Au- <br />thority") is in the process of purchasing an undivided <br />interest in the Southeast Water Purification Plant (the <br />"Southeast Plant") under construction by the City of Houston <br />and is planning the construction of a transmission system <br />and a distribution system to transport water from the <br />Southeast Plant to the customers of the Authority; and <br />WHEREAS, the Board of Directors of the Authority <br />desires to issue bonds to pay for its undivided interest in <br />the Southeast Plant; and <br />WHEREAS, pursuant to Section 54.516, Texas Water <br />Code, as amended, the Authority is required, when it desires <br />to issue bonds, to submit in writing to the Texas Water <br />Commission an application for the investigation of the pro- <br />ject proposed to be purchased or constructed and of the <br />Authority's bonds proposed to be issued, together with a <br />copy of the engineer's report and a copy of the data, plats, <br />profiles, maps, plans and specifications prepared in connec- <br />tion with such project; and <br />WHEREAS, the Board of Directors of the Authority <br />desires to secure the approval and consent of the Texas Water <br />Commission to the construction of the Southeast Plant and <br />
The URL can be used to link to this page
Your browser does not support the video tag.