My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-02-1987 Meeting
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
07-02-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
3/21/2025 2:41:52 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
7/2/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Ac, per your i.natructi.ons we i--ave quoted this professional Ce.rvicF <br />in two parts. Part onr is for tl-~f. total project .Length.; <br />beginning at. the SEWPP and t.erminat,ing at the South right-of-way <br />ling: of Spencer Highway. Part two will commence at the Northeast <br />right--of-way line of Red E3l.uff Road ar~d would terminate at, the <br />Soutl-, right-~of.-way line of Spencer Eiighway. <br />The fee .for this p.rojec:t is to be based ors an hourly charge <br />according to the attached rate scl-~edule. The total fee, based on <br />these rates, shall not. exceed $10,500.00 for part one as <br />described in this letter and shall not exceed $5,500.00 for part <br />t.wo as described in this .letter. Terms of payment will be net 10 <br />days from date of ir,voi.ce. <br />We would he able to proceed immediately; allowing a one week <br />period for sched+.iling planning and mobilization; upon receiving a <br />signed copy of this letter of agreement and a notice to proceed. <br />If the entire project (Part One) is selected; it will req+aire 42 <br />caler~da.r days from the date we receive the notice to proceed. We <br />estimate 2.3 to `L5 working days. The 42 calendar days represents <br />week-ends, holiday's and tr,e one week for planning, scheduling <br />and mobilization. <br />If Part. Two is selected; i.t will require 28 calendar days from <br />the date we receive tree notice to proceed. We estimate 15 <br />working days. The 28 calendar days represent week-ends, holidays <br />ar~d the one week for planning, scheduling and mobilization. <br />We wish to thank you for allowing us the opportunity to provide <br />you with a quotation for this professional service. If the <br />terms, conditions and scope of work in this letter meet with your <br />approval and you select our firm for the project, please sign and <br />return to our firm. It shall be the basis for our understanding <br />and contract with you far this project. <br />Sincerely, <br />1~ ~ <br />C ~ ~ .v <br />,'James F.~~-JJBeck <br />,. Vice-President <br />Mr. Bob Herrera <br />City Manager <br />All complaints regarding surveying services should be forwarded <br />to the Texas Baard of Land Surveying, 7703 North Lamar, Suite <br />304, Austin, Texas 78752. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.