Laserfiche WebLink
• • <br />1.2.6 Prepare a Report containing schematic layouts, sketches and conceptual <br />design criteria with appropriate exhibits to indicate clearly the considerations <br />involved (including applicable requirements of governmental authorities having <br />jurisdiction as aforesaid) and the alternative solutions available to OWNER and <br />setting forth ENGINEER'S findings and recommendations. This Report will be <br />accompanied by ENGINEER's opinion of probable costs for the Project, including the <br />following which will be separately itemized: Construction Cost, allowance for <br />engineering costs and contingencies, and (on the basis of information furnished by <br />OWNER) allowances for such other items as charges of all other professionals and <br />consultants, for the cost of land and rights-of-way, for compensation for or damages <br />to properties, for interest and financing charges and for other services to be <br />provided by others for Owner pursuant to paragraphs 3.7 through 3.11, inclusive. <br />The total of all such costs, allowances, etc. are hereinafter called "Total Project <br />Costs". <br />1.2.7 Furnish 30 copies of the Design Engineering Report documents and <br />review them in person with OWNER <br />The duties and responsibilities of ENGINEER during the Design <br />Engineering Report Phase are supplemented as indicated in paragraph 2 of Exhibit A <br />"Further Descriptions of Basic Engineering Services and Related Matters". <br />1.3 Reserve <br />1.4 Final Design Phase <br />After written authorization to proceed with the Final Design Phase, <br />ENGINEER shall: <br />1.4.1 On the basis of the accepted Design Engineering Report Phase <br />documents and the opinion of probable Total Project Costs prepare for incorporation <br />3 <br />