My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-23-1987 Meeting
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
09-23-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
3/21/2025 2:41:56 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/23/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />In the event that the Houston Director"s estimates have <br />been larger than Actual Construction Costs resulting in <br />an overpayment by the Authority of its pro rata share, <br />Houston shall refund such difference to the Authority on <br />or before the expiration of ninety (90) days of date of <br />the receipt of the accounting by the Authority. <br />In the event that the Houston Director"s estimates have <br />been less than Actual Construction Costs which has <br />resulted in an underpayment by the Authority of its pro <br />rata share, the Authority shall pay such difference to <br />Houston on or before the expiration of ninety (90) days <br />of the date of the receipt of the accounting by the <br />Authority. <br />2.05 Completion of the Project <br />When the Project is completed and has been accepted by the Houston <br />City Council, Houston shall notify the Authority Director and designate <br />a day upon which initial operation of the Project is to begin. <br />Houston shall provide the Authority with full access to the • <br />Project and to the books and records of the Project including all <br />engineering reports, design specifications, change orders, <br />correspondence, plant accounts, construction plan accounts or any other <br />written document or instrument associated with or pertaining to the <br />.construction of.the project. <br />ARTICLE III <br />• -.;___ OPERATION AND MAINTENANCE OF THE PROJECT .,,~ <br />-n. ~ .._ _ _ 3-v1 In General <br />(i) Houston and the Authority as co-owners of the Project, <br />understand that, except in areas otherwise specified <br />herein, Houston will serve as managing owner of the <br />construction phase of the Project and of the maintenance <br />and operation thereafter and shall have charge of its <br />business and general conduct. <br />(ii) The Authority shall have an interest in the conduct, <br />affairs and decisions of the Project in proportion to <br />its capital contribution. The Authority shall have the <br />authority to enter the Project premises. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.