My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-23-1987 Meeting
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1987
>
09-23-1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
3/21/2025 2:41:56 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/23/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTEP1BEH 21 , 1987 <br />CITY OF HOUSTON, TEXAS <br />LA PORTE AREA WATER AUTHORITY <br />COST SHARING WATER PROJECT CONTRACT <br />STATE OF TEXAS <br />COUNTY OF HARRIS <br />KNOW ALL MEN BY THESE PRESENTS: <br />This cost sharing water project contract (the "Contract") made and <br />entered into as of the date last specified by and between the CITY OF <br />HOUSTON, Texas, a municipal corporation which is situated and has its <br />principal office at City Hall, Houston, Harris County, Texas <br />(hereinafter called "Houston"), and the LA PORTE AREA WATER AUTHORITY, <br />a conservation district and political subdivision of the State of Texas <br />which is situated in and has its principal office at City Hall, La <br />Porte, Harris County, Texas (hereinafter called "the Authority"). .• <br />W I T N E S S E T H: <br />WHEREAS, both 1Houston and the Authority desire to proceed <br />expeditiously with the acquisition and construction of certain raw <br />surface water transmission facilities, surface water treatment <br />facilities, treated water storage facilities and pumping facilities <br />otherwise known as the Southeast Water Purification Plant (the <br />"Project"), to serve both Houston and the Authority, and <br />~:.. <br />WHER£A.S, because of the plans of the Authority to~supplq ezia?t#ng <br />and future treated water needs and the plans of Houston to supplq <br />existing and future treated water needs, it is deemed and hereby found <br />to be more efficient and cost-effective for both Houston and the <br />authority to jointly finance the construction and operation of thQ <br />Project; and . <br />WHEREAS, the joint construction and the operation of the Project <br />by-means of this Contract will facilitate needed water supplies to <br />serve both Houston and the Authority, and will help alleviate area <br />subsidence problems; and <br />NOW, THEREFORE, Houston and the Authority hereby agree to cost <br />sharing for the construction and operation of the Project under the <br />terms and conditions and for the considerations hereinafter set forth <br />as follows, to-wit: <br />
The URL can be used to link to this page
Your browser does not support the video tag.