Laserfiche WebLink
~~ r• <br />RESOLUTION AUTHORIZING APPLICATION TO THE <br />TEXAS WATER COMMISSION <br />FOR APPROVAL OF PROJECT AND BONDS <br />WHEREAS, La Porte Area Water Authority (the "Au- <br />thority") is in the process of purchasing an undivided <br />interest in the Southeast Water Purification Plant (the <br />"Southeast Plant") under construction by the City of Houston <br />and is planning the construction of a transmission system <br />(the "Transmission System") and a distribution system (the <br />"Distribution System") to transport water from the Southeast <br />Plant to the customers of the Authority; and <br />WHEREAS, the Board of Directors of the Authority <br />desires to issue bonds to pay for its undivided interest in <br />the Southeast Plant and additional bonds to pay the costs of <br />acquisition and construction of the Transmission System and <br />the Distribution System; and <br />WHEREAS, pursuant to Section 54.516, Texas Water <br />Code, as amended, the Authority is required, when it desires <br />to issue bonds, to submit in writing to the Texas Water <br />Commission an application for the investigation of the pro- <br />ject proposed to be purchased or constructed and of the <br />Authority's bonds proposed to be issued, together with a <br />copy of the engineer's report and a copy of the data, plats, <br />profiles, maps, plans and specifications prepared in connec- <br />tion with such project; and <br />