Laserfiche WebLink
~ ,. <br />SOUTHEAST WATER PURIFICATION PLANT <br />SUMMARY OF CONSTRUCTION COST AND ~. <br />CASH CONTRIBUTIONS <br />AS OF MARCH 31, 1992 <br />La Porte <br />Production 3,791,780.43 <br />Pumping 528,237.01 <br />Distribution 0.00 <br />Total Share: 4,320,017 44 <br />Credit per contract: <br />Paid to Date: 4,070,092.17 <br />---------------- <br />"CATCH-UP" 249,925.27 <br />U <br />