Laserfiche WebLink
<br />Statement of Project Status <br />La Porte Area Water Authority <br />Texas Water Development Board Loan # 939 <br />Design and Construction Phase <br />Water System Improvements <br />Water Purification Plant Protect <br />For the period inception through September, 30, 1993 <br />Source of Funds <br />TWDB Loan Proceeds (3-31-89) $ 5,000,000 <br />Interest Earnings on Construction Fund 262.036 <br />(3-31-89 to 9-30-93) <br />Total Sources of Funds 5,262,036 <br />Total Project Costs 5.130.666 <br />Current Accounting Surplus $ 131,370 <br />