My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-06-07 La Porte Area Water Authority minutes
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
2000's
>
2007
>
06-06-07 La Porte Area Water Authority minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:48 PM
Creation date
3/21/2025 2:42:22 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
6/6/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHmIT A <br />CAPITAL IMPROVEMENT PROJECT COST ESTIMATE FORM <br /> <br />Project Number: <br /> <br />Departmental Ranking: <br /> <br />3 <br /> <br />Project Name: <br /> <br />LP A W A SCADA System <br /> <br />Public Works <br /> PROJECT SCHEDULE: <br /> Planning: yrs. mos. <br />$25,000 Design: yrs. 3 mos. <br />$125,000 Engineering: yrs. mos. <br /> Land/ROW Acq.: yrs. mos. <br /> Construction Letting: yrs. mos. <br /> Construction: yrs. 6 mos. <br />$150,000 Total time to complete: yrs. 11 mos. <br />- <br /> <br />Responsible Department: <br /> <br />TYPE OF COST: <br /> <br />Land: <br /> <br />Design & Consulting: <br /> <br />Construction: <br /> <br />Furnishings or Equip: <br /> <br />Other <br /> <br />Contingency: <br /> <br />Total project estimate: <br /> <br />DOES THIS CO <br />COMPLETE T <br /> <br /> <br />No <br /> <br />ANNUAL IMPACT ON CITY OPERATIONAL COSTS (DESCRIBE): <br /> <br />None <br /> <br />Total estimated Annual Impact on City Operating Cost <br /> <br />Attach additional sheets if needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.