My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-04-09 La Porte Area Water Authority
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
2000's
>
2009
>
02-04-09 La Porte Area Water Authority
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:48 PM
Creation date
3/21/2025 2:42:25 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
2/4/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8. RECYCLING/REUSE <br /> <br />As previously noted, the City of La Porte is the only entity within the La Porte Area Water <br />Authority with the capability of reuse and recycling of treated effluent. Current use <br />includes the recycling of approximate one million gallons per month at the Main La Porte <br />Wastewater Treatment Plant used in process water, i.e., washdown, irrigation. <br />Additionally, as indicated above, recycled water is made available and used by the La <br />Porte Municipal Golf Course and the Little Cedar Bayou Park for irrigation purposes. The <br />amount will vary of course during seasonal and various weathers. No recycling or reuse <br />is anticipated by Morgan's Point or Shoreacres. <br /> <br />H. RECORDS MANAGEMENT SYSTEM <br /> <br />The La Porte Area Water Authority maintains a records management system to <br />monitor and track customer account information and usage data for deliveries <br />and sales. The data for water produced is monitored and recorded to enable <br />accurate tracking of monthly or daily water usage. Water loss form the <br />transmission system is monitored on a monthly schedule. The La Porte Area <br />Water Authority does not operate a surface water reservoir. Therefore an <br />operations plan is not a component of this water conservation plan. <br /> <br />I. IMPLEMENTATION I ENFORCEMENT <br /> <br />The General Manager of the La Porte Area Water Authority acts as the <br />Administrator of the Water Conservation Program. The Administrator oversees <br />the execution and implementation of all elements of the program. He is also <br />responsible to oversee the keeping of adequate records for program verification. <br />Each entity is responsible for furnishing all information needed and requested by <br />the Authority. <br /> <br />The program will be enforced through adoption of the Water Conservation Plan <br />by Ordinance or Resolution. In addition, the entities of the La Porte Area Water <br />Authority have adopted a water conserving plumbing code. The Ordinances and <br />Resolution are found in Appendix C. The appropriate plumbing code listings are <br />found in Appendix D. <br /> <br />Each entity will provide certified copies of all ordinances and resolutions <br />concerning water rates, plumbing codes, and other regulatory documents <br />necessary for the administration of this plan, including all updates. <br /> <br />J. CONTRACT REQUIREMENTS <br /> <br />Upon contract renewal or contract extension with The La Porte Area Water <br />Authority each wholesale customer shall develop and implement a water <br />conservation plan or institute water conservation measures using the applicable <br />elements of Title 30, Chapter 288, Subchapter A. If the customer intends to re- <br />sell the water, then each successive wholesale customer shall also implement <br />applicable water conservation measures. This requirement shall be made part of <br />every water supply contract. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.