Laserfiche WebLink
<br />(Dan Wardrop). The anticipated outcome of these meetings will be the selection of a single theme with a <br />preferred traffic concept that will be the basis for a Phase II fly through DVD. Currently DVD <br />turnaround is approximately two weeks after conclusion of Phase I and authorization to proceed with the <br />Phase II. <br /> <br />The Phase Irenderings and meetings as described above will be provided for the lump sum of $12,000, <br />followed by a Phase II fly through DVD for an additional $10,000. <br /> <br />We have performed some structural work for the City of La Porte in the past (LP LEPC) and have run our <br />standard PSA-l contract past City Attorney Mr. Clark Askins. The attached contract has the same terms <br />and conditions as the contract previously approved by Mr. Askins. <br /> <br />Should you have any question, please do not hesitate to call me at 713-914-6614 or Dan Wardrop at 713- <br />914-6590. <br /> <br />Sincerely <br />URS Corporation <br /> <br />~~i~ <br /> <br />Bruce A. Broberg <br />Vice President <br /> <br />CC: Dan Wardrop <br />