My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2008
>
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
3/21/2025 2:44:07 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
9/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />Mr. Michael Bagstad, PE Utility Infrastructure Leader <br />Mr. Rich Squire, PE Traffic Leader <br />Mr. Bill O'Brien ALSA Landscape Design Leader <br />Mr. David Cabage, Cost Estimation Leader <br /> <br />FEES AND EXPENSES and additional services <br /> <br />Time and Materials not to exceed <br /> <br />$197,000.00 <br /> <br />Design and Construction Administration <br />Traffic and Infrastructure Studies <br /> <br />$162,000.00 <br />$35,000.00 <br /> <br />Attachments <br /> <br />A: Hourly Rates for URS staff <br />B: Boundary of the Plaza <br />C: Contract for services URS PSA1 <br /> <br />REIMBURSABLE EXPENSES <br />The professional fees do not include reimbursable expenses. Reimbursable expenses <br />are all expenses incurred in connection with the project including copies, photos, <br />models, renderings, express mail, supplies travel(site trips, meetings), lodging, <br />meals, printing, and long distance phone calls in connection with the project,. <br />Reimbursable expenses are typically between 5% and 15% of the professional fees, <br />depending upon travel distances and frequency of meetings. Due to the proximity of <br />the Five Points Plaza we anticipate the project-related expenses not to exceed <br />$19,900.00. <br /> <br />Additional services not include in the above <br /> <br />URS has in-house capabilities <br /> <br />Geotechnical Services Estimate To be Determined (TBD) <br />Environmental Testing TBD <br />*Surveying of the Plaza area allowance $7,000.00 additional <br />Construction phase services TBD <br />Designs outside Plaza boundary TBD <br />Cost Of Permitting TBD <br /> <br />Contractors as built documents TBD <br /> <br />URS Corporation <br />9801 Westheimer,Suite 101 <br />Houston,Texas 77042 <br />Tel: 713 789-9801 <br />Fax: 7137898404 <br />
The URL can be used to link to this page
Your browser does not support the video tag.