My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2008
>
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
3/21/2025 2:44:07 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
9/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />October 1, 2008 <br /> <br />Mr. Ron Bottoms <br />City Manager <br />City of LaPorte <br />6500 Fairmont Parkway <br />LaPorte, Texas 78730 <br /> <br />RE: Five Points Plaza Design, Construction phase services and Studies Proposal <br /> <br />Dear Mr. Bottoms: <br /> <br />I appreciate this opportunity to have URS provide planning and design services for <br />the Five Points Plaza Site. <br /> <br />I would like to thank you, Gretchen Larson, Deborah Dye, John Joerns, and Tim <br />Tietjens for the support we have received thus far. We hope you have found our <br />previous efforts to be valuable tools to the redevelopment of the Five Point area. The <br />renderings provided our initial vision of the possibilities for the Five Points area. <br />Recently we were excited to develop the thought provoking and inspiring video <br />presentation. URS is prepared to proceed into the development of the plaza based on <br />the two previous efforts. <br /> <br />From the initial conversation with Bruce myself and the subsequent visits with your <br />staff I am confident that we can help you realize your objectives for an exciting <br />public plaza for the citizens of LaPorte and southeast Texas. The work plan as <br />understood will establish requirements for the Five Points Plaza, and assist in the <br />establishment of a direction and strategy for your near-term and long-term <br />development. <br /> <br />Our compensation for the design of the plaza and the traffic and infrastructure plaza <br />on a time and material not to exceed are as follows: <br /> <br />$140,000.00 for the plaza design <br /> <br />$22,000 for construction phase services <br /> <br />$35,000.00 for traffic and utility infrastructure studies relating to the plaza area. <br /> <br />$19,900.00 for reimbursable expenses <br /> <br />$7,000.00 allowance for surveying plaza <br /> <br />$223,900.00 <br /> <br />URS Corporation <br />9801 Westheimer,Suite 101 <br />Houston,Texas 77042 <br />Tel: 713789-9801 <br />Fax: 713 789 8404 <br />
The URL can be used to link to this page
Your browser does not support the video tag.