My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-10-08 Special Called Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2008
>
11-10-08 Special Called Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
3/21/2025 2:44:08 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
11/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Knudson # 0080990 <br /> <br />b. Water & Sewer <br />i. Investigate existing water and sanitary sewer systems to confirm <br />that both water and sanitary sewer systems have capacity for a <br />restaurant operation. <br />c. Rights of Way and Easements <br />i. Confirm limits and stipulations of existing rights-of-way and <br />easements, if applicable. <br />d. Engineering Feasibility Report <br />i. Provide a brief narrative, with exhibits as found appropriate, <br />identifying key site design and development issues that may affect <br />the Scope of work. <br /> <br />III. Building Engineering Feasibility <br />a. Structural <br />i. Investigate existing building wall and roof system to determine if <br />existing structure can support addition to parapet wall. <br />ii. Investigate existing building wall and roof system to determine if <br />new monument can be integrated into existing structure, or if the <br />new monument must be free standing. <br />b. Electrical <br />i. Investigate existing building wall to see if there are circuits that will <br />be affected by modifications to the wall structure. <br />ii. Determine if exterior improvements will cause Electrical Code <br />upgrades. <br />c. Engineering Feasibility Report <br />i. Provide a brief narrative, with exhibits as appropriate, identifying <br />key building condition and construction issues that may affect the <br />Scope of Work. <br /> <br />IV. Construction Document Phase - 30%, 60% and 90% Submittals <br />a. Based on the approved Conceptual Design that was presented to the <br />Economic Alliance and City of La Porte officials on 08.18.08, Knudson will <br />prepare Construction Documents consisting of Drawings and <br />Specifications setting forth in detail the requirements for construction of <br />the project and will show the location, configuration and characteristics of <br />the proposed site features as follows: <br />i. Site Improvements <br />1. Demolition Plan <br />2. Site Plan <br />3. Storm Water Protection Plan <br />4. Planting Plan: showing planting locations, quantities and <br />recommended plant species <br />5. Irrigation plan: showing main line routing, head layout, <br />valves, pipe size and irrigation controller location <br />6. Paving plan for pedestrian and vehicular areas, including <br />paving layout and material selection <br />7. Parking lot grading and drainage design <br />8. Architectural gateway design, accent material selection <br />and construction detailing <br /> <br />Page 2 of 4 November 25, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.