My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-14-02 Meeting of the La Porte Development Corporation Minutes
LaPorte
>
City Secretary
>
Minutes
>
LP Redevelopment Authority
>
2000's
>
2002
>
08-14-02 Meeting of the La Porte Development Corporation Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:29:10 PM
Creation date
3/21/2025 2:46:49 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Redevelopment Authority/TIRZ
Meeting Doc Type
Minutes
Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Taylor Bayou Watershed Master Drainage Plan <br /> <br />9.0 SUMMARY OF FINDINGS <br /> <br />This study was conducted to evaluate the drainage impacts and mitigation needs to serve the <br />proposed improvements in the Taylor Bayou Watershed and the TIRZ in La Porte, Texas. The <br />summaries of findings are as follows: <br /> <br />1. The hydrologic analysis revealed that 308.6 ac-ft of detention would be required to mitigate <br />fully developed conditions. <br /> <br />2. The proposed detention facilities will total approximately 422.1 ac-ft. <br /> <br />3. The detailed routing analysis revealed that 338.7 ac-ft of detention would be required to <br />mitigate fully developed conditions. <br /> <br />4. Three detention ponds and two waterway corridors are proposed to mitigate the increase in <br />runoff. <br /> <br />5. Two new channels are proposed and improvements to Al 04-12-0 1 are proposed to convey <br />the 100-year peak flow to the detention facilities. The proposed channels will be trapezoidal <br />channels with 10 foot bottom widths, 3:1 side slopes and will range in depth between 6 and <br />8 feet. <br /> <br />6. The project will require 107.7 acres to accommodate all the proposed improvements <br />associated with the drainage plan. <br /> <br />7. The total estimated construction cost for the proposed drainage improvements is <br />approximately $10,759,020 which includes a 20 percent contingency. <br /> <br />CivilT e{:h <br />Engineering, Inc. <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.