Laserfiche WebLink
<br /> The TIRZ Improvements <br /> Exhibit B <br /> The TIRZ Improvements <br /> Phase I Phase II Total <br /> Estimated estimated Estimated <br /> Costs Costs Costs <br />Streets wi Storm Systems <br />Powell Rd (100' ROW) $ 1,077,000.00 $ 718,000.00 $ 1,795,000.00 <br />Powell Rd (60' ROW) $ 841,000.00 $ $ 841,000.00 <br />Abandon Powell Rd. $ $ $ <br />Wharton Weem Blvd. $ 587,000.00 $ 381,000.00 $ 968,000.00 <br />McCabe Rd. $ $ 225,000.00 $ 225,000.00 <br />Water Distribution System <br />12" Pubic Mains $ 320,000.00 $ $ 320,000.00 <br />Offsite Segment Crossing SH 146 (12') $ 35,000.00 $ 316,000.00 $ 351,000.00 <br />Sanitary Sewer System <br />Uft Station/Force Main $ 137,000.00 $ $ 137,000.00 <br />Public Mains 8"-12" $ 308,000.00 $ $ 308,000.00 <br />Offsite Public Mains $ $ 66,000.00 $ 66,000.00 <br />Drainage Projects <br />Stormwater Detention/Drainage <br />- Acquisition of 32 ac. $ 2,300,000.00 $ $ 2,300,000.00 <br />- Construction: Excavation $ 1,360,000.00 $ $ 1,360,000.00 <br />- Construction: Storm Sewer $ 1,232,000.00 $ $ 1,232,000.00 <br />Sidewalks <br />Sidewalks/Pedestrian Trails along Major Roadways/Drainageways $ 120,000.00 $ $ 120,000.00 <br />Landscaping <br />Along Major Roadways $ 300,000.00 $ $ 300,000.00 <br />Clearing <br />Public ROWand Easements $ 120,000.00 $ $ 120,000.00 <br />SH146 WHARTON WEEMS <br />Proportionate share for the Construction of Wharton Weems Interest and Asscoiated Cost $ $ 200,000.00 $ 200,000.00 <br />Engineering (15%) $ 1,047,000.00 $ 256,000.00 $ 1,303,000.00 <br />TOTAL ESTIMATED COSTS $ 9,784,000.00 $ 2,162,000.00 $ 11,946,000.00 <br /> <br />Note: The La Porte Redevelopment Authority and Tax Increment Reinvestment Zone recognize that the Harris County Interlocal Agreement requires that Powell Road be <br />constructed as a four lane roadway when traffic conditions warrant. <br />