Laserfiche WebLink
CITY OF IA POP~'E, TF~{AS PROPOSED SUBDIVISION ORDINANCE <br />LINKAGES ~ OTHER DOCUMENTS <br />COP~PREIIII4SIVE PLAN REFERENCE <br /> i <br /> <br />x m o ~ <br /> <br />~ N <br />W F <br />~ ~ <br />~ w <br />O w <br />U w <br />U w <br />U <br />U U <br />z t <br />.7 <br />a <br />O <br /> <br />N H <br />F <br />H F W <br />N <br />~ H <br /> <br />] <br />H W~ <br /> <br />Q ~' <br /> <br />~ a <br /> <br />W <br /> <br />W a <br />W <br />W U t <br /> <br />~1 zW <br /> <br />a a <br /> <br />~~ s <br /> <br />W <br />q %i ~ Z W 0 W <br />I~ H ~ Z f~ ~, <br />~ H t~ <br />~~ ~ ~: ~ E+ <br />W H <br />O a W <br />~ H~ W NATURE OF LINKAGE <br />aw w as H w ~ ~ 0 8 w m 8 N ., N o a~, a <br />N ~ a (1.2) (1.3) (1.4) 1.5) (1.6) (1.7) (1.8) (1.9) (1.10) <br />Beginning P«ge 1-1 1-12 1- 29 1-43 1-50 1-57 1-62 1-68 1-74 <br />';~}obit Numbers 2 thru 6 7 thru 9 10 thru 12 13 14 3 15 16 None <br />X <br />Sidewalks to be constructed in conformance <br /> 5.03 to PICM. <br />. X Lot widths & areas to be in accordance with <br /> 5.04 Zoning Ordinance. Lots in ETJ to meet <br /> Subpar.5 Zoning Ordinance width & area requirements <br /> <br />_ for R-1. <br /> X Building & yard setback requirements to be <br /> 5.07 in accordance with Zoning Ordinance. Bui1d- <br /> inq lines in ETJ meet Zoning Ordinance re- <br /> quirements for R-l,except non single family <br /> side yards fronting public street to be 20'. <br /> X defined <br />rivate easements are poorl <br />Where <br /> , <br />y <br />p <br /> 5.08 existing facilities therein (such as pipe- <br /> lines) to be surveyed & tied to lot lines. <br /> Building setback lines then to be estab- <br /> lished per Zoning Ordinance. <br /> -- ll <br />d <br />b <br />i <br /> X e <br />nsta <br />e <br />Developer survey monuments to <br /> 6.00 in accordance with PICM and tied to City <br /> monument system. <br /> X Developer to pay for & install street lights <br /> <br /> 7.01 in accordance with PICM. <br /> X Developer to guarantee construction of all <br /> <br /> 7.02 approved public improvements associated <br /> with his project per PICM. <br /> X Developer reimbursement for oversize util- <br /> 8.01 ivies to be per PICM <br /> X Public improvements design & improvement to <br /> 11.01 thru be~per PICM. <br /> 11.25 <br />• • • <br />