My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-06-1984 Planning and Zoning Commission Regular Meeting (2)
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1980's
>
1984
>
12-06-1984 Planning and Zoning Commission Regular Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:39 AM
Creation date
3/21/2025 2:52:38 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/6/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 2 <br />WELCH-REZONING CON' T. <br />• <br />Semi-Controlled Access Hwy (SCAH). The Parkway should <br />• ultimately be designed for 8 moving lanes with a ROW capacity <br />of up to 10 moving lanes. This type of thoroughfare should <br />generally have a signal every two miles but not closer than <br />every one mile. It should move between 800 and 1000 vehicles <br />per hour. A SCAH should be designed to speed traffic <br />movement. Any additional lanes could be contained within the <br />existing ROW. The proposed project will have little impact <br />on Thoroughfare Plan. <br />C. It should be considered <br />commercial sites developed <br />Park. These developments <br />stores, and a mini-storage <br />areas that are currently <br />Parkway. <br />that there have been several other <br />along Fairmont Parkway at Fairmont <br />include two car washes, two convenience <br />complex. Note that these took place in <br />zoned "C" commercial along Fairmont <br />D. There was some initial question as to the availability of sanitary <br />sewer to this site because of the plant loading problem mentioned <br />in my memo of 12/6/84. After researching this problem it was <br />noted that the College View MUD board had granted these two <br />owners sewer tap privileges. These were restricted to 5 <br />commodes, 3 urinals, and 8 wash basins. The City's policy has <br />been to accept these prior commitments. <br />E. There exists a pipeline easement on this particular tract that <br />• divides the tract into two segments. The eastern and smallest <br />section of this tract is the area that is proposed for a <br />convenience store. This tract is of slightly less than 10,000 <br />square feet. The western two thirds of the tract has no <br />specific use proposed other than future retail development. <br />SUMMARY <br />There are several areas that should be noted before re-zoning should <br />take place. These are listed below: <br />A. This request is somewhat contrary to the proposed Comprehensive <br />Plan as "R-2" is proposed. <br />B. The existing and current commercial projects along Fairmont <br />Parkway indicate a trend toward this type of commercial <br />development. Regional commercial growth trends along Fairmont <br />Parkway west of the City merit consideration also. <br />R ECOMM ENDATION <br />This request has been reviewed based on the existing zoning ordinance <br />with facts from the proposed plan used for support. The analysis <br />shows little or no negative impact on the community or the proposed <br />• master plan with the granting of this request. Based on the facts <br />listed above and to remain consistent with the guidelines already set <br />.forth by the Planning and Zoning Commission, the following <br />recommendation is given: <br />
The URL can be used to link to this page
Your browser does not support the video tag.