My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-16-1993 Regular Meeting of the Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1993
>
12-16-1993 Regular Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:36 AM
Creation date
3/21/2025 2:54:01 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
12/16/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning and Zoning Commission <br />Glen Meadows, Section VI <br />• Staff Report of 2/17/94 <br />14. Contour Lines: <br />15. Building Lines: <br />16. Lavout & Identification: <br />17. Condominiums: <br />18. Reserves: <br />19. Streets: <br />20. Street Names: <br />21. iJtility Easements: <br />• <br />Properly noted (separate sheet). <br />Properly noted.' <br />Properly noted. <br />Not applicable. <br />Not applicable. <br />Properly noted. <br />Properly noted. <br />Properly noted. <br />22. Flood Hazard Area: Not applicable. <br />23. Survey Monument Tie In: Properly noted." <br />• 24. Survey Control Monuments: Not applicable."' <br />B. Documentation <br />1. La Porte Development Checklist: Submitted and on file. <br />2. Title Certificate: Submitted and on file. <br />3. Utility Schematics: Submitted on sepazate sheet. <br />' Developer has requested Boazd of Adjustment variance to allow 20 foot front setback on cul-de-sac lots. <br />If granted, amended setbacks must be noted on Final Plat. <br />A City of La Porte survey monument is located at southeast corner of Lot 27; Block 12 and park. This <br />is noted on the plat of Section V. <br />"' Survey Conb-ol monuments aze required in a ratio of one monument per each 5 acres of a development. <br />Monuments aze normally located at subdivision corners. All comers of this subdivision have been <br />clearly identified. Staff is working with the developer to determine which corners aze the most <br />appropriate :for permanent monumentation. <br />Reviewed By: ~~~ .. ~ Date: ~ a <br />
The URL can be used to link to this page
Your browser does not support the video tag.