My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-21-1994 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1994
>
07-21-1994 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:36 AM
Creation date
3/21/2025 2:54:09 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
7/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />• Page 4 of 7 <br />Planning & Zoning Commission <br />Minutes of July 21, 1994 <br />1984 PRIORITIES <br />Combination Responsibilities <br />Priority Group Project Current Status <br />1. SH225/SH146 Interchange. Under design; construction in 1996. <br />Alternate Truck Route to Bazbour's Cut Blvd. Proposed to be deleted. <br />2. Grade Sepazation on SH146 at Bazbour's Cut Fairmont Pkwy. complete; Bazbour's Cut <br />Blvd. and Fairmont Pkwy. Blvd. under design. <br />3. SH225 Completion as Freeway to Intersection Under construction. <br />of SH146. <br />Underwood Road from Proposed "S" Street to Approximately 50% complete. <br />Fairmont Pkwy. Upgrade to Primary Arterial. <br />• 4. Completion of Bay Area Blvd. from Fairmont <br />Pkwy. to Spencer and Upgrade to Arterial <br />Standard from Spencer to SH225. <br />• Complete Underwood from Proposed "S" Complete. <br />Street to SH225. <br />Others Upgrade Fairmont Pkwy. to Semi-controlled <br />Access Highway. <br />Link "L" Street to Barbour's Cut Blvd. Proposed to delete. <br />1984 PRIORITIES <br />City Responsibilities <br />• <br />Priorit~+ Group Project <br />2. Farrington Blvd. Crestway to Spencer; <br />Widen to 4 Lanes. <br />Farrington Blvd. from Crestway to North "H" <br />Street; Develop 4 Lane Section. <br />Current Status <br />R-O-W being Purchased and Design <br />Underway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.